You can install your putting green using a base of concrete,
asphalt, crushed rock & crushed limestone or just crushed limestone. Concrete
is the best and also the most expensive. Most people prefer to construct their base
using crushed limestone because it is the most economical. When using a
concrete base, you should follow the appropriate steps below. The concrete should be
formed to comply with the desired size of the putting green and step 5 should be done before the
concrete hardens. You should also consider the contour of the putting green before pouring the
concrete.
Installation of our
putting greens using the crushed limestone base is as easy as 1, 2, 3. The
instructions make the installation simple and easy to enable the average home owner to
install it himself. Installation of the putting green usually takes one day, and you
probably already own most of the tools needed.
Simply click on the links below to view the easy steps to your putting green
and/or sand trap.
Note: All turfs will expand and contract to some degree
based on temperature conditions.
|